Architectural visualization of an Ave Wave artificial surf pool

Ocean engineering · Russia & CIS

Ocean-quality waves
for your city

Ave Wave designs and delivers energy-efficient surf destinations for private investors — from site assessment to commissioning and service.

Concept visualization

Scroll
30 secbetween sets
up to 240waves per hour · H series
415 kWpeak power · H series

Investment idea

More than a pool. A destination.

An artificial wave can anchor an entire development: attracting new audiences, encouraging repeat visits and connecting sport, leisure and real estate.

01

Surf sessions

Core traffic from beginner, recreational and professional sessions.

02

Academy & events

Coaching, training camps, competitions and corporate formats.

03

Destination ecosystem

Hospitality, food, rentals, retail and added value for the wider site.

Core technology

More waves. Controlled power.

Ave Wave's frontal system scales output with the venue configuration. Power figures below refer to the wave generator only.

H series · one-direction break

240waves per hour
415 kWpeak power

F series · A-frame

480surf lines per hour
830 kWpeak power

S30 · side generator

120waves per hour
from 100 kWhenergy consumption

Maximum mode: 120 sets per hour, two waves per set. In the F series, every A-frame wave offers both a left and a right shoulder. S30 is a side system with flexible wave sequencing.

Simulation

The wave before construction

Computer simulation for every configuration — engineering analysis of wave shape and behaviour before build.

More about technology
One-direction pool H1Single surf zone
One-direction pool H2Two zones — pro and beginner
Two-direction pool F1Single zone, left and right rides
Two-direction pool F2Two zones, line-up flagship
Side generator S3030 chambers, flexible wave sequencing

Configurations

Scaled to your site

CAPEX is assessed individually and depends on geology, utilities, existing infrastructure and the intended operating model.

View all models

Location hub

Every wave becomes a new point on the map

A location page can serve as a completed-project showcase or become a full promotional platform with news, events and session sales.

KORBI
In development
KORBIЛемболово, Ленинградская область
View project

End-to-end delivery

From site to first wave

01

Site assessment

Geology, utilities, climate and the commercial scenario.

02

Concept & estimate

Configuration selection, requirements and preliminary economics.

03

Engineering

Integration of the generator, pool and technical infrastructure.

04

Production & construction

Implementation support and control of critical technical systems.

05

Launch & service

Commissioning, team training and technical support.

Key answers

Investor questions

How much does an artificial wave project cost?

The estimate follows a site assessment. CAPEX depends on geology, available power, water, utility connections, existing buildings and the selected model.

What kind of site is suitable?

Ave Wave supports indoor and outdoor formats, from compact sports facilities to surf parks and resort destinations.

What does Ave Wave deliver?

Pre-design assessment, configuration selection, engineering, wave-generator production, construction support, commissioning and service.

What is the difference between the H and F series and S30?

The H series produces a one-direction break. The F series creates an A-frame with left and right shoulders. S30 is a side generator with flexible wave height and sequencing.

Start a project

Tell us about your site. We will prepare the inputs for an estimate.

A first conversation identifies the right configuration and next step without pretending CAPEX can be priced before the site is understood.

+7 981 544 0909